S360 is a platform whose goal was to integrate strategic business processes into independent applications and integrate them. The underline goal was not only to create a platform but to achieve the effect of leapfrog and placing a construction company on the list of technology companies.

EHS

Environment Health and Safety

Since 2013 delivered, implemented and developed till now
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator

S360

Intro

From the moment I get familiar with BIM methodology (2015), I have been enchanted by it. The idea of ​​parameterizing the design process is a solution that designers have dreaming for years.
To simplify things, so far architectural programs (CAD) have drawn lines that were only a graphic symbol of the wall. In the BIM framework, the same line transformed into a completed parameterized representation of the wall with all properties: thickness, structure, functions, etc.

Since I was working with a construction leader, I decided to use this analogy to show what benefits could be derived from using the same approach when designing new applications. This is how the idea of ​​the platform was born.

The premise of the platform was to create one center that stored all business logic, calculations, and integrated information downloaded from various applications connected to it. The platform plan included building a set of applications that were to perform various functions. This case study will focus on two of them two of the key ones. The other two EHS and DMS have been identified in the portfolio as separate projects, because their genesis is different, although they were to be part of the platform.

Revenue - a set of closely related applications that allow you to maximize company ROI
Leasing - a tool for managing the tenant placement strategy

Prototype of building editor | 2017

Background

About

Running an investment process is a very complicated task to calculate. Besides the obvious data such as running costs, purchase costs, various types of taxes, etc., time is a key component. All of these variables make calculating the ROI is a time-consuming process.
As a solution, and the acceleration of this procedure was designed Revenue app

Core info

Team size
9
End users
• Global Board level executives
• Regional Board level executives
• County Board level executives
• Financial controllers
• Project Managers (project - building complex)
• Accountants
• Leasing manages
Role

• Advocate of pro-platform design
• Design system designer lead
• UI designer
• Visual designer
• UX design consultant

Business requirements
Creating a solution that allows you to calculate real-time scenarios for the course of a construction investment
Market
• Central Europe - Target branch
• Local (Poland) - Test group
Tasks
• Analyzing the customer's business model
• Preparation of the platform vision for indicative purposes
• Creating a complete system design for platforms (and developing it along with the project)
• Designing data-rich user interfaces
• Creating tools in the version with business guidelines and versions with the platform version
• Creating mockups and prototypes of applications with the platform
• Presentation to the stakeholder and project team
• Creating the concept of supporting applications (future platform development)

Building editor redesign concept | 2017

Study

Project data

Project challenges
• Thorough analysis of the business model
• Understanding of the enumeration relationships
• Data heavy user interface with end users with various goals
Competitors
Microsoft Excel
3rd party integration
Microsoft Active Directory
Resources / Knowledge base
• S360 framework
• S360 knowledgebase
Used tools
• Sketch App
• InVision
• Abstract
• Google Slides
• Google Sheets
• Google Docs

Research

  • Users are Working on a very complex Excel sheet - standardized (but with tendencies to change)
  • No version control, change comparison requires Excel sheet duplication and change comparison
  • File operations take uptime
  • Inability to verify changes in real-time and across the organization
  • All data is entered  manually
  • Creating investment scenarios is burdened with the possibility of irregularities
  • The process of making financial decisions is multi-stage and complex
  • No real possibility to be certain if a worse transaction in financial terms is worse for the entire investment (due to the dominant time factor, it does not have to be this way)
  • Complex control process
  • Work experience plays an important factor in the qualification of an employee, as it cannot fully rely on the timeliness of the data

Pain points

  • Limited access to end users - they constantly changed their excelles due to the nature of their work
  • Complex business model

Work with all kinds of content 3

From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.

App features

TIMELINE

With the visualization of the time factor, it can become a representation of the events of the investment process and time manipulation as well

BUILDING EDITOR

Building representation in the system allows for precise space management and illustrates the progress of the investment

SCENARIOS

The possibility of creating scenarios allows a real-time analysis of a larger number of investment variants. In the future, it was planned to use AI to search for the most optimal solutions.

CALCULATIONS

A key factor of the system is the ability to manipulate the calculations and manage the calculations that will contribute to the project portfolio.

Summary Platform + Revenue

S360 reached the MVP level and required further work and more complex user testing. Complete documentation was created, documentation specifying how to work on components and design guidelines. Thanks to the prepared library of design elements, it was possible to create new system elements efficient and also to modify the old ones.

The platform still required some work to reach the production level. However, due to the complex process of financial calculations - a key factor for the usefulness of the project was achieved.

High need to work with stakeholders (at the executive level) and residual access to end-users, was decided to suspend work on the platform. That leads to the decision to focus only on a part of a solution, that will deliver a quick win for the organization.

Deliverables

  • Platform style guide
  • User journey
  • High and low fidelity mockups
  • Design documentation
  • Clickable prototypes
  • Variations of components

Results

  • Multiple versions of applications and platform were created
  • A style guide has been implemented with a range of granularity of elements, from atoms to components
  • The basis of the platform was created along with the design documentation
  • Revenue applications (and supporting applications that supplied it with data were marked as key objectives for future development)

Work with all kinds of content 3

From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.

Environment Health and Safety

Since 2013 delivered, implemented and developed till now
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator
Used tools
Adobe Photoshop
Adobe illustrator

Leasing

Intro

In mid-2019, a decision was made to extract a Leasing app of the Revenue application. The purpose of the application was to create tools for leasing  negotiators. The key workflows and business needs were identified in 2016 when I was working on a mobile application presenting the company's global portfolio. A special feature of the Leasing application was an ability to create the so-called "tenant mixes".  In other words, it is a modeling of space and hence financial flow.

Core info

Year
2019-2020
End users
• 12 leasing negotiators
• 5 project managers
• 3 financial controllers

Role
Product designer

• UI lead
• UX lead
• Visuals
Market
Poland (Local)
Team size
4
Tasks
• Redesign Leasing as a self-sufficient application
• Discover and redesign user journey
• Redesign Leasing application screen flow
• Communication with stakeholders
Business requirements
• Identifying and preparing new user journeys
• Change the screen layout and thus the components

Revenue redesign | Prototype | 2019

Environment Health and Safety

Since 2013 delivered, implemented and developed till now

Study

Project data

Project challenges
• Redesigning the system without its original assumptions
• Need to create a simplified calculation model
• Redesigning the application components keeping in mind that it might happen back integration to platform rules
Research / interviews
• Changing the scope of the study made it possible to clarify the scenarios for the work of leasing managers
3rd party integration
• Salesforce
• S360
• Microsoft Azure Active Directory
• Microsoft Power BI
Competitors
• Salesforce
• Microsoft Excel
Resources / Knowledge base
• DMS 1.0 as a reference
• S360 Style Guide
Used tools
• Figma
• Sketch App
• InVision
• Abstract
• Google Slides
• Google Sheets
• Google Docs

Leasing workflow & Components | Wireframes | 2019

Summary Leasing

I strongly believed that we (as a team) will be able to put a construction company on the map of technology firms. As is the case with healthcare and other old industries.

Personally, as a trained architect, I am associated with the industry, and it was an additional motivator to fight for it. Unfortunately, the digital revolution met with the company's strategy, COVID-19, and other decisions that slowed down the pace of work. I regret that it was not possible to hand over most of the application to users so that they could experience the benefits of the platform environment. The goal was ambitious but within reach. However, not achieved fully. The experience and the lesson from building the platform are invaluable.

Deliverables

  • User journey
  • Wireframes
  • Mockups
  • Prototypes
  • Styleguide
  • Scenarios walkthrough 

Results

  • After 4 months of work, the project was prepared for developer valuation
  • At the turn of the year, a decision was made to complete work on the s360 platform. Thus, the project never completed the development work

Work with all kinds of content 3

From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.From colors to images, text to numbers, define the content and structures you need for your project.